Monday, December 21, 2009
Sunday, December 20, 2009
One level poured, one to go
Wednesday, December 16, 2009
Hmmm, plenty of wine coolers
Sunday, December 13, 2009
Block cut, ground plumbing completed
The block has been cut, the base plumbing, (sewerage and storm water) completed and the electricity trench has been dug. The site has been prepared with the split level (garage, bedroom 2 and bathroom on the top level and the rest of the house on the bottom level).
Wow, where did the slope come from? I thought we bought a level block, oops.